Sai Chatra (K) Ltd

Operations Control · Mombasa Plant

Laundry Jobs

Every consignment moves through the production stages below. Rewash is a loop back into quality control, never a separate count.

Jobs In Production

9

across all stages

Pieces In Production

4,862

today

In Quality Control

512

pieces being inspected

In Rewash

13

RW-240923-007